Technology of arrangement of concrete floors with hardened topping
calculation and development of floor design
levelling of the surface with the help of laser level
preparation of base course
reinforcement
placement of concrete plate or fibrous concrete mixture (class not less than В25)
vibrocompaction of concrete mixture with the help of immersion and surface vibrators
introduction of topping (hardening mixture (2/3 of total amount) in 4-5 hours after laying of concrete).
disc smoothing
surface evenness control
repeated application of topping (1/3 of total amount)
disc smoothing
blades trowelling
application of membrane generator
cutting of contraction joints
joints sealing (recommended not earlier than in 40 days)
total topping consumption 3-5 kg (depending on the manufacturer's recommendations).
For the purpose of top layer hardening the following toppings may be used: "Refloor", "Panbeks" and also toppings of other manufacturers.
Be happy!
News
The site is under construction
The site is under construction. Please visit us later.
More...
7/31/2008
More news...
Jan
February 2012
Mar
Sun
Mon
Tue
Wed
Thu
Fri
Sat
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
1
2
3
4
5
6
7
8
9
10
Don't worry!